![]() |
#1321
|
||||
|
||||
![]() Quote:
Ahh, the problem with having a nice slab and roof, can easily bring machines in and fill up the space, without having the inside finished yet. I know that problem too well. ![]() ![]() ![]() Sent from my iPhone using ShopFloorTalk
__________________
Brian You don't know what you don't know. ![]() "It's what you learn after you know it all that counts." John Wooden ![]() |
#1322
|
||||
|
||||
![]()
Heard back from Georgia Power. I'll have to stop by the local office and buy my meter base. Otherwise I'll only owe $1000 for my underground service to the shop. Engineer spec'd a 75kva pad mount transformer for me.
__________________
Tim Self appointed director of junk, and old vehicles. |
#1323
|
||||
|
||||
![]()
Heres the panels I plan to use.
Two Square D QO 200 amp main panels. These will supply everything and my sub panel in my living space and the phase converter. Also got surge protectors. The other two panels are my three phase panels. The phase converter will feed the 225 Amp Siemans panel. The small Square D might get used elsewhere if needed.
__________________
Tim Self appointed director of junk, and old vehicles. |
![]() |
Thread Tools | |
Display Modes | |
|
|