Shop Floor Talk  

Go Back   Shop Floor Talk > Welding and Metalworking Forums > Shop & Safety

SFT Search:   
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 03-08-2018, 12:55 PM
KevinF KevinF is offline
Senior Member
 
Join Date: Nov 2013
Location: Saskatoon
Posts: 616
Default

Quote:
Originally Posted by midmosandblasting View Post
Not from experience but read . On a poured slab go down on edge below frost line then out to the same width . This is supposed to stop it from freezing slab . Dr. Dean had a thread on pouring the floor in side his shop and used I thought floor heat . Maybe he will check in on how it worked .
Frost goes down 9ft some years. errrr.. 2.74m..
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Web Search:

All times are GMT -5. The time now is 06:47 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2019, vBulletin Solutions Inc.