Back working on the building after a short break.
Framing more wall sections. Met with Georgia Power on Tuesday Febuary 9th. So far the plan is to set a pole on my side of the road and then run underground about 250 feet to a pad mount transformer. Out of the transformer about another 40 feet to the meter on the building. Looking at my load calculations I think a 400 amp service will be enough.