View Single Post
  #10  
Old 12-03-2005, 08:59 AM
gagiii
Guest
 
Posts: n/a
Default

Quote:
Originally Posted by Pile Buck
Congratulations on the new shop! You sure got some screaming deals on materials , but I’m a tad bit confused on the building method. What do you mean by “Hybred building”? You say the slab is going in first, so this leads me to believe your going stick built, and not post frame But you don’t have enough trusses to go stick built. Going to buy more later? Can you enlighten me / us which way your going
Pile,
The 15' metal posts will be bolted to the slab just like a metal building. I'm going to use doubled 8" c perlings for my plates. The trusses are designed to be on a 5' center, but I'm puting my on a 4' center and they will be bolted to the c perlings with angle iron brackets that will mimic hurricane clips. so it's part metal building and part wooden thus a hybrid.
Reply With Quote