View Single Post
  #21  
Old 03-08-2018, 12:55 PM
KevinF KevinF is offline
Senior Member
 
Join Date: Nov 2013
Location: Saskatoon
Posts: 615
Default

Quote:
Originally Posted by midmosandblasting View Post
Not from experience but read . On a poured slab go down on edge below frost line then out to the same width . This is supposed to stop it from freezing slab . Dr. Dean had a thread on pouring the floor in side his shop and used I thought floor heat . Maybe he will check in on how it worked .
Frost goes down 9ft some years. errrr.. 2.74m..
Reply With Quote