Shop Floor Talk  

Go Back   Shop Floor Talk > Search Forums

SFT Search:   
Showing results 1 to 2 of 2
Search took 0.01 seconds.
Search: Posts Made By: digger doug
Forum: Fabrication 04-12-2018, 09:29 AM
Replies: 18
Views: 2,506
Posted By digger doug
Yes, when I did regular drawing work, we just...

Yes, when I did regular drawing work, we just used letters.

Got into buildings and such work, with large contracts, and subs.

They said, use numbers (for any changes) after the drawings are...
Forum: Fabrication 04-11-2018, 06:49 AM
Replies: 18
Views: 2,506
Posted By digger doug
Revisions are "letter based" after the product is...

Revisions are "letter based" after the product is built.

Number based revisions are for after the drawing is released, but before the shop builds the first one.

So make it "Revision A".....:D
Showing results 1 to 2 of 2

 
Forum Jump
Web Search:

All times are GMT -5. The time now is 09:42 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2019, vBulletin Solutions Inc.